Computer Power Protection (CPP) has a long standing relationship with Options Technology dating from 2009 when CPP supplied, commissioned and maintained 2 x Riello UPS Master Plus 400kVA UPS stand-alone systems with associated batteries in an A & B arrangement.
As Options Technology’s demand increased the data centre grew around the UPS resulting in limited space for access around the UPS. When Options Technology looked to update, increase capacity and resilience on the existing UPS system arrangement they engaged Computer Power Protection. We reviewed the existing installation and propose a solution that met with their criteria along with all change-over works at weekends and without any downtime.
Due to space constraints CPP proposed, 4 x Riello UPS Multi Power Modular UPS systems in stand-alone configuration with each UPS initially having 4 x Riello UPS Multi Power 42kW power modules installed to provide 126kW in N+1 configuration and capacity to add more power modules should the load increase over time.
Read the full case study to see how we overcome challenges and provide bespoke solutions tailored to our customers requirements.
“CPP have always been extremely professional and meticulous in their work so when it came to upgrading our existing UPS infrastructure, they were always going to be our number one choice. Several months of planning and staged migration weekends resulted in a seamless transfer over to the four new UPS with no downtime to our core infrastructure. A real testament to their work.”
Glenn Selby VP Global Head of Datacentres for Options Technology
If you require a backup power solution, reach out to us today. An expert member of our team will be able to assist you today.
“This was a challenging project due to the mission-critical nature of the installation environment, but the CPP team did a fantastic job seamlessly upgrading the data centre to its new Multi Power UPS system. We have a positive long-standing relationship with Computer Power Protection, they’ve been authorised Riello UPS resellers and service partners for several years now and we know just how professional, capable, and customer-focused their team is. This was a challenging project due to the mission-critical nature of the installation environment, but the CPP team did a fantastic job seamlessly upgrading the data centre to its new Multi Power UPS system.”
Barry Jarvis, Sales & Marketing Manager for Riello UPS